Sealmaster Liquid Road & Master Seal

Sealmaster Liquid Road & Master Seal

Asphalt

Paving, Overlay, Infrared Patch, Cold patch

Professionally clean and prep surface. Provide crack repair and pothole repair. Mix and prepare sealer on job sight prior to appl seal coat.

One coat of Master Seal squeegee applied.

Parking lot has alligator cracks and water has been pooling. Recommend demo asphalt and remove 4 inches of base. Install 4 inches of new base and compact. Install 4 inches of asphalt

Scope of work install 25 Ton overlay to address trip hazards and pooling. R&R sections that are loose, add and compact base.

full demo versus Overlay and pot hole repair

“it’s better to have 6 inches of base and 4 inches of asphalt then to have 6 inches of asphalt and 4 inches of base.” The most important thing is to start with a good base, compact every two inches. Once asphalt has started to alligator there is a good chance that the base has been compromised, and the only thing to do is R&R the area.